Answer
Feb 22, 2021 - 04:20 AM
The installation instructions are pretty clear on this point. These are located on the product detail page to the right of the product details in the download section (link included below for your convenience."Transport and store the cartons horizontally. Unopened cartons should be acclimated at the job site in a dry, well-ventilated area for a MINIMUM OF 24 HOURS. Remove planks from packages just before starting the installation. During storage and installation, maintain temperature and relative humidity to a level consistent with the conditions which will prevail when the building is occupied. In most cases, this means maintaining a temperature range from 65�F to 82�F (18�C to 28�C) and relative humidity range from 35% to 65%. Use heating or air conditioning to control temperature and humidity before starting installation..."https://www.greenbuildingsupply.com/core/media/media.nl?id=1740812&c=772072&h=2
7678035eefdf4846ec5&_xt=.pdf
7678035eefdf4846ec5&_xt=.pdf
