Staff Answer
Jul 23, 2024 - 01:56 AM
Per the Installation Guidelines, https://www.greenbuildingsupply.com/c... , " General Installation Guidelines�?� The Marmoleum Cinch LOC Seal cartons should be stored flat, and unopened, for approximately 2 - 3 days in the center of the room in which they are to be installed. In the winter months, store the cartons for approximately 6 days.�?� Tools and Materials Required:o Tape Measureo Fitting Wedgeso 3/8" Spacerso Pencilo Hammero Straight Back Hand Sawo Keyhole Saw or Jigsawo Angle or Adjustable Bevelo Foam Underlayment (for concrete subfloors or subfloors with underfloor heating) "
