Answer
May 12, 2021 - 04:23 AM
You will want to follow their instructions to a T. It is a particular coating and you want it to stick correctly. Here are the application instructions. https://www.greenbuildingsupply.com/core/media/media.nl?id=137219&c=772072&h=a3
5a368d7904a54730e0&_xt=.pdf It states, "For best coverage, use a 3/4� nap paint roller and roll out the first coat perpendicular to(against) the grain. This allows the coating to work into the cracks and splinters, filling them up and locking them down. Allow to dry completely before applying the second coat (approx.30 minutes to one hour). Between coats reseal lid and keep out of direct heat. Stir product often during application.10. Apply second coat in the opposite direction or parallel with the grain of the wood. The second coat is key to attaining the proper texture. A � nap roller will produce a more aggressive surface in the second coat. A 3/8 nap roller will produce a less aggressive surface in the second coat. Apply second coat immediately following the application and the drying of the first coat.Be consistent in your technique. Allow to dry.11. Additional coats may be applied to build the final mil thickness, if desired. Mixed coating must be used within 24 hours."
5a368d7904a54730e0&_xt=.pdf It states, "For best coverage, use a 3/4� nap paint roller and roll out the first coat perpendicular to(against) the grain. This allows the coating to work into the cracks and splinters, filling them up and locking them down. Allow to dry completely before applying the second coat (approx.30 minutes to one hour). Between coats reseal lid and keep out of direct heat. Stir product often during application.10. Apply second coat in the opposite direction or parallel with the grain of the wood. The second coat is key to attaining the proper texture. A � nap roller will produce a more aggressive surface in the second coat. A 3/8 nap roller will produce a less aggressive surface in the second coat. Apply second coat immediately following the application and the drying of the first coat.Be consistent in your technique. Allow to dry.11. Additional coats may be applied to build the final mil thickness, if desired. Mixed coating must be used within 24 hours."
