Answer
Jan 10, 2022 - 01:04 AM
Forbo Click Cinch Loc requires relative humidity to be in the ballpark of 30-60% year round. The Kahrs Engineered has this same requirement. Your best bet given the humidity range you are talking about is Forbo's glue-down sheet or glue-down tile.To get technical for a minute, the basic conditions for installation are as follows, per Forbo's technical department."We state that areas to receive material should be clean, fully enclosed, and weather tight. The permanent HVAC should be fully operational and controlled and set at a minimum temperature 65� F (18.3� C). If this is not possible, the areas should be acclimated and controlled by means of temporary HVAC to the service level conditions expected during occupancy. The temperature and humidity should range from 75� F � 10�F (23.9� C � 5.5� C) with a 50% � 10% ambient relative humidity. These conditions must be established at least seven days prior to beginning the installation, maintained during the installation, and continued for at least seven days following the installation."You can browse our Forbo Glue-Down Sheet options here: https://www.greenbuildingsupply.com/All-Products/SheetYou can browse our Forbo Glue-Down Tile here: https://www.greenbuildingsupply.com/All-Products/Tile