Answer
Jul 08, 2024 - 11:50 AM
Per the Application Instructions at the bottom of the page, " Roll and cut the SVS to the length of the starting wall and position the underlayment over the subfloor as needed to attain proper coverage.Shiny side should be facing up.Secure the entire length of the underlayment paper edge with staples.The starting row of paper should be stapled every two feet in order to keep the paper flat; the succeeding rows do not need to be stapled down.In the succeeding rows the paper should be placed under the previous row of paper by 4? and is not to be taped or nailed down. This will provide a smooth surface which will make the planks slide easily over the underlayment. "
