Answer
Jul 01, 2020 - 09:16 AM
We reached out to the manufacturer to confirm. As long as the space is able to be temperature controlled the glue down Marmoleum sheet products (Such as Forbo Marmoleum Real) would be able to be installed in this type of application. The temperature and humidity should range from 75� F � 10�F (23.9� C � 5.5� C) with a 50% � 10% ambient relative humidity. These conditions must be established at least seven days prior to beginning the installation, maintained during the installation, and continued for at least seven days following the installation. This consistency will allow the adhesive to set up and cure properly. Once the material is properly installed the temperature drops should not impact it.With regard to "guaranteed", which we read as "warranted" : The warranty will be for the material only, so it will be key that the material is installed properly. In addition to ensuring the proper installation guidelines are followed you will also want to inspect the substrate to ensure it is suitable to receive the new flooring, as any flooring is only as strong as what it is installed on top of. Any issues found to be the result of improper installation or substrate failures will fall outside of the Forbo warranty. The Substrate Evaluation & Preparation Guidelines is located in the downloads section of the product detail page, I will also include a link here : https://www.greenbuildingsupply.com/core/media/media.nl?id=1105539&c=772072&h=9
abbeafb5f1e280a72a7&_xt=.pdf
abbeafb5f1e280a72a7&_xt=.pdf
