Answer
Dec 08, 2022 - 01:15 AM
Glue down tile/sheet is actually best and not the Cinch Loc. Per Forbo, "We state that areas to receive material should be clean, fully enclosed and weather tight. The permanent HVAC should be fully operational and controlled and set at a minimum temperature 65� F (18.3� C). If this is not possible, the areas should be acclimated and controlled by means of temporary HVAC to the service level conditions expected during occupancy. The temperature and humidity should range from 75� F � 10�F (23.9� C � 5.5� C) with a 50% � 10% ambient relative humidity. These conditions must be established at least seven days prior to beginning the installation, maintained during the installation, and continued for at least seven days following the installation. ". Follow the glue down tile or sheet goods instructions per the product page.
