Answer
Jun 10, 2022 - 04:54 AM
You will want to use glue down sheet goods. Because the Airstream won't be heated/air conditioned all year long like a house would, Forbo states that areas to receive material should be clean, fully enclosed and weather tight. The permanent HVAC should be fully operational and controlled and set at a minimum temperature 65� F (18.3� C). If this is not possible, the areas should be acclimated and controlled by means of temporary HVAC to the service level conditions expected during occupancy (like in an enclosed climate-controlled garage, for example). The temperature and humidity should range from 75� F � 10�F (23.9� C � 5.5� C) with a 50% � 10% ambient relative humidity. These conditions must be established at least seven days prior to beginning the installation, maintained during the installation, and continued for at least seven days following the installation. And then follow the application instructions as displayed in the Downloads section on the right-hand side of the product page, direct link below for your convenience.https://www.greenbuildingsupply.com/core/media/media.nl?id=1250860&c=772072&h=U
uktmdJLDwLCjVPOLkIpK_9Vihz7kQkj0y4_8s2JFMBTsXBM&_xt=.pdf
uktmdJLDwLCjVPOLkIpK_9Vihz7kQkj0y4_8s2JFMBTsXBM&_xt=.pdf
