Answer
Jul 09, 2024 - 01:52 AM
Here are their installation specs from the right side of the product page under Downloads, https://www.greenbuildingsupply.com/core/media/media.nl?id=2709338&c=772072&h=K
ZziP-aViKzSBxVRE5SU1JcjjZc1e7Go947Bgch_IIVamfHb&_xt=.pdf . "Glue Down Installation:(Required for planks less than 4mm thick)QuietBoard is to be glued down when paired with any glue down floor covering or a floating floor covering<4mm thick.Begin by troweling a high-quality multipurpose flooring adhesive using the adhesive manufacturer's recommended trowel size.Lay panels of QuietBoard perpendicular to flooring direction, film side up, butting them tightly (see pic #2).QuietBoard panels are to be installed while adhesive is still wet.QuietBoard panels need to be rolled with a 75lb-100lbroller to ensure a full bond is made.Panels need to be staggered at approximately 50%eliminating a grid style layout (see pic #2).�� Expansion gap is to be left at all perimeter walls(see pic #2).All seams need to be properly prepared in accordance with the flooring manufacturer�s recommendations.Failure to properly prepare seams will void all warranty.We do not recommend taping seams in glue down installation.Install flooring perpendicular to QuietBoard according to manufacturer's specifications (see pic #4). "
ZziP-aViKzSBxVRE5SU1JcjjZc1e7Go947Bgch_IIVamfHb&_xt=.pdf . "Glue Down Installation:(Required for planks less than 4mm thick)QuietBoard is to be glued down when paired with any glue down floor covering or a floating floor covering<4mm thick.Begin by troweling a high-quality multipurpose flooring adhesive using the adhesive manufacturer's recommended trowel size.Lay panels of QuietBoard perpendicular to flooring direction, film side up, butting them tightly (see pic #2).QuietBoard panels are to be installed while adhesive is still wet.QuietBoard panels need to be rolled with a 75lb-100lbroller to ensure a full bond is made.Panels need to be staggered at approximately 50%eliminating a grid style layout (see pic #2).�� Expansion gap is to be left at all perimeter walls(see pic #2).All seams need to be properly prepared in accordance with the flooring manufacturer�s recommendations.Failure to properly prepare seams will void all warranty.We do not recommend taping seams in glue down installation.Install flooring perpendicular to QuietBoard according to manufacturer's specifications (see pic #4). "
