Answer
May 10, 2022 - 04:45 AM
When applying a glue down product (Forbo sheet goods or glue down tiles) in an interior, non temperature controlled area, the areas to receive material should be clean, fully enclosed and weather tight. The permanent HVAC should be fully operational and controlled and set at a minimum temperature 65� F (18.3� C). If this is not possible, the areas should be acclimated and controlled by means of temporary HVAC to the service level conditions expected during occupancy. The temperature and humidity should range from 75� F � 10�F (23.9� C � 5.5� C) with a 50% � 10% ambient relative humidity. These conditions must be established at least seven days prior to beginning the installation, maintained during the installation, and continued for at least seven days following the installation. Follow the product installation instructions: https://www.greenbuildingsupply.com/core/media/media.nl?id=1250860&c=772072&h=U
uktmdJLDwLCjVPOLkIpK_9Vihz7kQkj0y4_8s2JFMBTsXBM&_xt=.pdf
uktmdJLDwLCjVPOLkIpK_9Vihz7kQkj0y4_8s2JFMBTsXBM&_xt=.pdf
