Answer
May 17, 2024 - 01:56 AM
In conversion vans/trailers/RVs/things that move, it's best to install glue down Marmoleum. It has more give than anything else for the movement that occurs. https://www.greenbuildingsupply.com/All-Products/Sheet Forbo states that areas to receive material should be clean, fully enclosed and weather tight. The permanent HVAC should be fully operational and controlled and set at a minimum temperature 65� F (18.3� C). If this is not possible, the areas should be acclimated and controlled by means of temporary HVAC to the service level conditions expected during occupancy. The temperature and humidity should range from 75� F � 10�F (23.9� C � 5.5� C) with a 50% � 10% ambient relative humidity. These conditions must be established at least seven days prior to beginning the installation, maintained during the installation, and continued for at least seven days following the installation.Here is the Substrate Evaluation and Prep guide: https://www.greenbuildingsupply.com/core/media/media.nl?id=1105539&c=772072&h=N
0Pjs_x5m5-vaykxEA5L49IM-geuCV18usS_AgHBrYhEEsjD&_xt=.pdf
0Pjs_x5m5-vaykxEA5L49IM-geuCV18usS_AgHBrYhEEsjD&_xt=.pdf
