Answer
Oct 09, 2019 - 06:12 AM
Wait at least three weeks before you put anything on a freshly poured concrete floor because it takes that long for it to dry. You don't want to trap vapors inside. If you want to be sure of the moisture level, rent a moisture meter from your local hardware store or tool rental store. Also, use pH strips to check to see if it is arrived at a neutral pH range before applying any sealer. After your concrete floor is dry and has a neutral pH, then Mexeseal is an excellent product and comes in two sheens, satin and semi-gloss.
